medyag
搜索
这是描述信息
Position:
Homepage
/
/
2013

2013

  • Categories:Development path
  • Author:
  • Origin:
  • Time of issue:2013-06-25 18:08
  • Views:

(Summary description)the third gas-burning tunnel kiln was put into operation, and the annual production capacity reached 2.5 million pieces by then.

2013

(Summary description)the third gas-burning tunnel kiln was put into operation, and the annual production capacity reached 2.5 million pieces by then.

  • Categories:Development path
  • Author:
  • Origin:
  • Time of issue:2013-06-25 18:08
  • Views:
Information

the third gas-burning tunnel kiln was put into operation, and the annual production capacity reached 2.5 million pieces by then.

Scan the QR code to read on your phone

Previous: 2014
Next: 2005
Previous: 2014
Next: 2005
imgboxbg

Follow us on social media

Copyright © 2020 Luoyang Meidiya Ceramics Co., Ltd.

豫ICP备17028291号-1    Power by 300.cn

Contact us

Address: China•Xin'an Ceramic Industrial Park

Customer Service Phone: 400-887-9758 / 800-883-1758

Email: david@medyag.com.cn  mdy01 @medyag.com.cn

Website: http://www.medyag.com.cn

 

Address:

 China•Xin'an Ceramic Industrial Park

Scan it

这是描述信息
Online message
code